HIGHLIGHTS: Corrupt PNCC MRP Contract — Seismic idiocy — Corrupt noise standard — Safety ignored — Deliberate errors — Selective compensation for favoured victims — Transmission line duplicity — Kenderdine’s outrageous conduct — Mighty River Power’s espionage and blatant perjury given a free pass.

no

CLICK HERE FOR THE LATEST ON THIS SCANDAL

NB: WHEN YOU CLICK THE LINK ABOVE YOU WILL GET

Sorry, the page you were looking for in this blog does not exist.

JUST CLICK HERE ON “HOME” –  GOOGLE – MOTTO “DON”T BE EVIL”  WAS WORKING WITH THE GOVERNMENT UNTIL 3RD MARCH TO HIDE THE CORRUPTION AND FRAUD BY KENDERDINE

For a summary visit

http://nzwindfarms.wordpress.com/

Earlier Turitea Wind Farm Documents.

The Turitea Wind Farm Final Decision is faulty on numerous levels. Every effort has been made behind the scenes to resolve the issues raised in the correspondence posted here, but these efforts have failed.  The Turitea Board of Inquiry and the now retired chair, former Judge, Shonagh Kenderdine – NOW EXPOSED AS CORRUPT AND COMMITTING A BLATANT CRIMINAL FRAUD –  ignored all submissions relating to these matters, which are now being put in the public arena to bring a resolution. The sell off of SOE’s, in particular Mighty River Power, is bringing these matters into sharp focus.

Each issue is dealt with separately. The correspondence below is between the Environment Court, the Environmental Protection Authority and the office of the Minister for the Environment.   

  • The foundation document for the wind farm is based on fraud. Palmerston North ratepayers have had their rights as property owners cancelled by the formerly secret contract between PNCC and Mighty River Power, which overturns the Local Government Act 2002. This contract is on the MFE website.

    Letter re PNCC MRP contract

             

          The full contract.

           

          christopher-shaw-attachment-1-part-a  

        

  •   The wind farm has been approved on two of the country’s most dangerous fault lines.  

    Turitea seismic issues

        See page 10 for Alexander’s seismic “evidence”.

        gavin-alexander-appendix-1 

           

        The Board does not ask any questions about the fault lines. 

        Evidence Alexander

          

           

        Appendix 1 Christchurch Press on the noise standard

        Appendix 2 Revisit noise standards Christchurch Press

            

       Appendix 1 Dr Thorne noise report 15 june 2011

            

 

Professor Dickinson’s protests released under the OIA.

  


             
            

  doc-119-dickinson-presentation (1)

            

      

         Appendix 2 Compensation issues Wheeler (B)

            

            

             

             

         The final attempt at a whitewash   

         Letter to Paul Stichbury – 12 October 2011

               

         To the Environmental Protection Agency 15 Oct 2011

         Letter – Mr Stichbury – 27 Oct 11

         To the Environmental Protection Authority 30 October 2011

              

          Final response from Dr Smith

 

Note: Dr Smith mentions only one fault line and avoids the issue of the       contract between PNCC and MRP.

  Impact statement     

 Someone in the Philipines trying to cover for Kenderdine

http://www.surfgoo.com/results/?q=how+to+make+13+month+authorization+letter

https://web.archive.org/web/20160816003058*/https://wordpress.com/wp-login.php?redirect_to=https%3A%2F%2Fwordpress.com%2Fstats%2Fday%2Fturiteadocuments.wordpress.com%3FstartDate%3D2016-08-15

[Non wind farm related – catechism-of-the-locomotive ]

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s